Pursuit Park Total Construction Cost Approximations (Not a Quote)
| Silver Field: 50'X100'
|
| From
Amusement Products |
| 20 Gun Equipment Package
|
$21,400.00 |
| Silver Field Net Package (No
Top) |
$6,000.00
|
| Slide Collar and Winch
Assemblies (2) |
$2,390.00
|
| Silver Field Bunker Package
|
$7,995.00
|
| |
Equipment Total
|
$37,785.00
|
| Construction Silver Field
|
| Grading (Depends on Current
Conditions) |
$4,000.00
|
| Poles (Steel)
|
$5,500.00
|
| Six Light Poles (@ 1000 Watts
Per Pole) |
$ 6,000.00
|
| Gravel
|
$3,500.00
|
| Field Prep Material
|
$1,500.00
|
| Labor (4 Men for Two Weeks)
|
$7,000.00
|
| Paint Sales and Storage Building (10'X20')
|
$12,500.00
|
| |
Construction Total
|
$40,000.00
|
| |
Grand Total
|
$77,785.00
|
| Gold Field: 75'X150'
|
| From
Amusement Products |
| 20 Gun Package
|
$21,400.00
|
| Gold Field Net Package (No
Top) |
$8,225.00
|
| Slide Collar and Winch
Assemblies (2) |
$2,390.00
|
| Bunkers for Gold Field
|
$9,990.00
|
| |
Equipment Total
|
$42,005.00
|
| Construction |
| Grading (Depends on the
Existing Conditions) |
$5,000.00
|
| Poles (Steel)
|
$7,500.00
|
| Eight Light Poles (@ 1000
Watts Per Pole) |
$8,000.00
|
| Gravel
|
$6,000.00
|
| Field Prep Material
|
$3,000.00
|
| Labor (4 Men for Two Weeks)
|
$12,500.00
|
| Paint Storage and Sales
Building |
$12,500.00
|
| |
Construction Total
|
$54,500.00
|
| |
Grand Total
|
$96,505.00
|
Amusement Contractors
will build the Silver size field on your site for $54,500 and the
Gold size field for $67,500. This does not include the rough grade,
the electrical work or the equipment supplied by Amusement Products.
|